Year of Science
麻豆影院 College of Arts and Sciences is celebrating a Year of Science!
Image
The College of Arts and Sciences held its annual awards banquet to recognize and honor its distinguished student leaders, teachers and advisors on April 21. James Blank, Ph.D., dean of the College of Arts and Sciences gave the welcome and closing remarks and presented the鈥
College of Arts and Sciences Honors its Distinguished Student Leaders, Teachers and Advisors
The College of Arts and Sciences held its annual awards banquet to recognize and honor its distinguished student leaders, teachers and advisors on April 21. James Blank, Ph.D., dean of the College of Arts and Sciences gave the welcome and closing remarks and presented the鈥Survivors of Cambodian Genocide during Khmer Rouge regime to speak
麻豆影院 State鈥檚 May 4 Visitors Center to Host Discussions on 鈥淐ambodia After 麻豆影院 State"
Survivors of Cambodian Genocide during Khmer Rouge regime to speakWork in Progress:
Currently installing 1J electric panel, wire and raceways.
4/21- Smith Hall Renovation Updates
Work in Progress: Currently installing 1J electric panel, wire and raceways.Work in Progress:
Completed first lift pour for elevator #2 (South).
Completed first lift pour for stair tower #3.
Grade beams and pile caps along column line 17 are complete.
Steel clips for sequence 1-4 are complete.
Steel erection for sequence 1-4 is in progress.鈥
4/21- ISB/Williams Hall Construction Updates
Work in Progress: Completed first lift pour for elevator #2 (South). Completed first lift pour for stair tower #3. Grade beams and pile caps along column line 17 are complete. Steel clips for sequence 1-4 are complete. Steel erection for sequence 1-4 is in progress.鈥Work in Progress:
Continuing the steam and condensation piping in the East Mechanical room.
Heating and snow melt piping is continuing in the West Mechanical room.
Continuing with the chilled water piping in the West mechanical room.
Working on plenum duct at AHU-1 in East鈥
4/21- Cunningham Hall Renovation Updates
Work in Progress: Continuing the steam and condensation piping in the East Mechanical room. Heating and snow melt piping is continuing in the West Mechanical room. Continuing with the chilled water piping in the West mechanical room. Working on plenum duct at AHU-1 in East鈥Two 麻豆影院 researchers from the College of Arts and Sciences have been awarded more than $1 million in federal grants for their research projects.
The National Institutes of Health鈥檚 National Institute on Aging awarded Gemma Casadesus-Smith, Ph.D., from 麻豆影院鈥
麻豆影院 State Researchers Receive More Than $1 Million in Grants to Fight Alzheimer鈥檚 and Study Climate Change
Two 麻豆影院 researchers from the College of Arts and Sciences have been awarded more than $1 million in federal grants for their research projects. The National Institutes of Health鈥檚 National Institute on Aging awarded Gemma Casadesus-Smith, Ph.D., from 麻豆影院鈥麻豆影院, in partnership with the University of Akron, will present a 鈥淲hy Polling Still Matters鈥 forum at 5:30 p.m. on Monday, April 25, in the 麻豆影院 Student Center Ballroom Balcony as part of the 鈥淧olitically Speaking鈥 public forum series discussing the upcoming鈥
麻豆影院 State to Hold Forum on Why Polling Still Matters
麻豆影院, in partnership with the University of Akron, will present a 鈥淲hy Polling Still Matters鈥 forum at 5:30 p.m. on Monday, April 25, in the 麻豆影院 Student Center Ballroom Balcony as part of the 鈥淧olitically Speaking鈥 public forum series discussing the upcoming鈥麻豆影院鈥檚 Ohio Employee Ownership Center (OEOC) will host the 30th Annual Ohio Employee Ownership Conference on Friday, April 29, at the Hilton West in Fairlawn, Ohio. The theme for the conference is 鈥淐elebrating Three Decades of Success: Growing the Employee鈥
麻豆影院鈥檚 Ohio Employee Ownership Center Hosts 30th Annual Ohio Employee Ownership Conference
麻豆影院鈥檚 Ohio Employee Ownership Center (OEOC) will host the 30th Annual Ohio Employee Ownership Conference on Friday, April 29, at the Hilton West in Fairlawn, Ohio. The theme for the conference is 鈥淐elebrating Three Decades of Success: Growing the Employee鈥Work in Progress:
Start forming elevator #2 (south).
Grade beam and pile caps along column line #17 between A and G is in progress.
Pile caps for elevator #2 are complete.
Installing pile caps for Stair #3.
Looking forward:
Steel erection sequence #1 will begin on鈥
4/14- ISB Construction Updates
Work in Progress: Start forming elevator #2 (south). Grade beam and pile caps along column line #17 between A and G is in progress. Pile caps for elevator #2 are complete. Installing pile caps for Stair #3. Looking forward: Steel erection sequence #1 will begin on鈥麻豆影院 will host the annual international conference of the Institute for Complex Adaptive Matter on May 16-18 at the 麻豆影院 Hotel and Conference Center.